Shore End and Beach Works

One of the most crucial phases, as it is the meeting point between marine and land infrastructure. This is where the cable is most vulnerable to human activity and wave abrasion.

Beach Works: Beach Manhole (BMH), land ducting.

Shore End Landing: involves small boats or barges since large cable ships cannot get too close to shore (cable pulling, floats, swimmer & diver support).

Installation & Protection in the Beach Area: articulated pipes (shell), trenching, securing the cable.

Final Stage: splicing at the Beach Manhole (BMH).

Contact Us

Layanan Lainnya

Installation & Maintenance of Subsea Cable

Installation & Maintenance of Subsea Cable

Complex installation and maintenance of submarine cables using high technology.

PLGR (Pre-Lay Grapnel Run) & Route Clearance

PLGR (Pre-Lay Grapnel Run) & Route Clearance

Clearing the route before the cable is laid.

Pre-Lay Shore End (PLSE)

Pre-Lay Shore End (PLSE)

A solution for shallow nearshore waters that large vessels cannot enter.