Installation & Maintenance of Subsea Cable

This process is highly complex and requires advanced technology due to the extreme marine environment. Submarine cable installation is a massive logistics and engineering operation, broadly divided into three main stages:

  • Route Survey
  • Cable Loading
  • Laying Process

Maintenance: although designed to last around 25 years, submarine cables often suffer damage, mainly from human activity (ship anchors / trawling) or seismic activity (undersea earthquakes).